Segment details from GIS, then the pre-flush checks. Demo values are filled in; tap Start a new flush to clear them.
List each pipe section in flow order, S1 nearest the source. The largest main is slowest and sets the flow needed.
Volume = 0.785 × D² × L × 1,000 per section. Flow needed = Table 1 for the largest main. Time per exchange = total volume ÷ flow. Gauge needed: Hose Monster = first Table 2 row at or above the flow; Pollard = [Q ÷ (29.83 × C × D²)]².
Close slowly and fully. Count turns. Re-open in reverse order at §8 and confirm the turns match.
Check turbidity every 5–10 min and watch colour; record one mid-peak reading. Throttle back if residual nears 140 kPa (20 psi), drainage is overwhelmed, or a hazard develops.
Same order as the kit's one-page field record. Everything stays on this phone. Add this page to your home screen to use it offline.